Customization: | Available |
---|---|
Condition: | New |
Certification: | GS, ISO9001, SGS |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Business Type | CNC turning/ CNC lathing/ CNC milling/ CNC drilling/ CNC grinding/ EDM/ etc. |
Standard | ASTM,/ ASME/ DIN/ JIS/ ISO/ BS/ API/ EN/ GB |
Certificate | ISO 9001/ ISO 14001/ ISO 45001/ ISO 10012/ ISO 13485/ IATF 16949/ SA 8000/ SGS Factory Audit/ Leading Factory |
Main equipments | CNC lathe/ CNC milling/ Stamping machine/ Automatic lathe/ Grinder/ Tapping /etc. |
Tolerance | +/-0.01mm ~ +/-0.001mm |
Material | 1.Stainless Steel: SS201, SS303, SS304, SS316 etc. 2.Carbon Steel: AISI 1045, 9SMnPb28 etc 3.Brass: C36000 (C26800), C37700 (HPb59), C38500(HPb58), C27200(CuZn37), C28000(CuZn40) etc. 4.Bronze:C51000, C52100, C54400, etc. 5.Iron:Grey iron and ductile iron 6.Aluminum:6061, 6063,7075,5052 etc. 7.Magnesium Alloy: AZ31, AZ61, AZ91 8.Plastic: PEEK, POM, NYLON, ABS...etc 9.Titanium: TC4 |
Surface Treatment | Polishing/ Deburring/ Chrome Plating/ Ni Plated/ Zinc plated/ Silver platinng |
Anodizing various colors/ Carburizing Nitriding/ Heat Treatment/ etc. | |
DRW Format | STEP/ STP/ GIS/ CAD/ PDF/ DWG/ DXF/ etc or samples. |
Inspection | Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier, CMM |
Depth Caliper Vernier, Universal Protractor, Clock Gauge, Internal Centigrade Gauge | |
Payment Term | 50% T/T + 50% T/T, Western Union, L/C |
Trade Terms | EXW, FOB, CIF, L/C |
Sample Lead Time | 3-7 Working Days |
Lead time | 7~45 days after confirming |
Packaging | Standard: pearl cotton and bubble bag, carton box and seal For large and big quantity: pallet or as per customers' requirement |